Stream reach had severe bank erosion
and channel migration, poor aquatic habitat and limited riparian buffer.
Restoration included bank grading, backfilling channel cut-offs, installation
of in-stream structures, moving pasture fencing to create additional buffer
and riparian planting.
Structures
Installed
(6) Rock vanes
(1) Rock / log vane
(1) Cross rock vane
(3) J hook vanes
(21) Root wads
(1) Permanent stream crossing
490 feet of rock toe protection
630 feet of bank grading