Reach of stream was eroding a section
of Muddy Creek along Owad Road with bank heights over 10 feet. Project design
was completed by Pennsylvania Fish and Boat Commission. Restoration included
installation of five in-stream structures to stabilize bank and create habitat,
bank grading and riparian planting.
Structures
Installed
(2) Rock vanes
(2) J hook vanes
(1) Root wad
300 feet of bank grading
Site Progression
(click on a
picture to see a larger view)